Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace AMI Metering Engineer jobs? · Latest report #giyanx3y
Your job has an expiration date
May 19, 2029
In 2 years, 7 monthsYour grid is a spaghetti mess, but soon it will be managed.
Network diagnostic expert, currently fighting ghost packets.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Real-time network stability, zero human error.






blub.you▸ POWERGRID SENTINEL V9▸ RARITY · UNCOMMON▸ DEPRECATION IN 2 YEARS, 7 MONTHSAI's Special Power
reboots thousands of unresponsive nodes simultaneously
You troubleshoot smart meter communications and fix local power network data syncs. Automation will eventually handle it all.
The one thing AI can't do
You can discern between a failed meter and a local transformer fire by sound.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Day 10
Smart software flags connection drops before you even notice them.
Month 6
Central systems patch meter logic without a truck roll.
Month 15
Meters automatically reroute traffic around failing network segments.
Year 2
Small robots perform simple hardware replacements at customer premises.
Year 2.6 · D-Day
Centralized neural nets manage the entire metering topology autonomously.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95.6%
4.2% daily
Meter connection failures
12 weekly
Manual site visits
9ms average
Data packet jitter
Your severance
A lifetime subscription to our outage-tracking API.
Discussion