Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Construction Engineering Coordinator jobs? · Latest report #t57nhij6
Your job has an expiration date
May 19, 2029
In 2 years, 7 monthsYour spreadsheets are just blueprints for our upcoming structural obsolescence.
Coordinator of steel, paper, and site-based headaches.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Closing the loop between design and site.









oof.youAI▸ STRUCTURALINK V4▸ RARITY · UNCOMMON▸ DEPRECATION IN 2 YEARS, 7 MONTHSAI's Special Power
validates shop drawings before you drink coffee
You manage RFIs and coordinate between detailers and site crews. We are automating the data flow between them.
The one thing AI can't do
You can sense when a detailer is lying about the steel beam fitment.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Week 4
Software reads your incoming RFIs and suggests answers automatically.
Month 4
Sensors scan shop drawings to find geometry errors faster than eyes.
Month 12
Bots sync schedules directly with fabricator inventory management systems.
Month 20
Wearable units provide erectors with real-time digital assembly guidance.
Year 2.6 · D-Day
The system assumes full control over all structural project documentation.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 94%
12 milliseconds
RFI turn-around time
99.9 percent
Error detection rate
0 seconds
Coffee-break duration
Your severance
A decommissioned hard hat and a digital PDF certificate.
Discussion