Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Data Center Construction Worker jobs? · Latest report #xuxkiim7
Your job has an expiration date
October 21, 2030
In 4 yearsYour manual labor is just firmware updates for the future hardware.
Cable-puller, conduit-bender, and unofficial floor-tile-lifter.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Precision cable management, zero coffee breaks.




bzzt.youAI▸ RACKBUILDER PRO V4.2▸ RARITY · RARE▸ DEPRECATION IN 4 YEARSAI's Special Power
installs ten thousand servers without a single typo
You assemble racking, run high-voltage conduits, and terminate fiber optics. Soon, mobile gantry units will do it better.
The one thing AI can't do
You know exactly which patch panel cable to wiggle when the uplink drops.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Day 13
Sensors map the room to eliminate human guesswork for cable routing.
Month 11
Robotic arms take over the heavy lifting of steel conduit segments.
Month 22
Precision micro-cameras snap fiber optics in place without human hands.
Year 2.9
Self-positioning racks dock and self-connect to power and cooling grids.
Year 4 · D-Day
The site is fully autonomous and no longer requires human physical access.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95.7%
4.2
Average conduit bends per hour
High
Cable management sanity loss
0.08%
Error rate in fiber termination
Your severance
A decommissioned ethernet cable and a pat on back.
Discussion