Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Distribution Project Engineer jobs? · Latest report #p226gava
Your job has an expiration date
May 14, 2030
In 3 years, 7 monthsYour spreadsheets predict grid load better than your actual power lines.
Expert in permit-wrangling and medium-voltage daydreams.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Optimizing energy pathways through raw compute






oof.youAI▸ NETPLANNER-GRIDLOGIC 9▸ RARITY · UNCOMMON▸ DEPRECATION IN 3 YEARS, 7 MONTHSAI's Special Power
autogenerates grid load balance reports instantly
You plan grid upgrades and manage infrastructure permits. You balance safety regulations against aging utility equipment daily.
The one thing AI can't do
You can still argue convincingly that a physical transformer relocation is technically impossible today.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Week 4
Sensors map your entire distribution network into a digital twin.
Month 5
AI suggests optimal cable paths faster than any human engineer.
Month 12
Software files standardized municipal paperwork to local planning councils.
Year 2
Algorithms predict failure points before the maintenance crews see them.
Year 3.6 · D-Day
Human oversight is now just an expensive liability for grid efficiency.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95%
42 yearly
Project delay days
11 percent
Safety form errors
Infinite
Coffee intake
Your severance
One high-voltage manual and a thank you card.
Discussion