Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Electrical Substation Designer jobs? · Latest report #vjwqh73c
Your job has an expiration date
March 15, 2030
In 3 years, 5 monthsDesigning grids for a future where you are the static load.
Master of one-line diagrams and grounding grid geometry.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Optimising power flow with absolute zero hesitation








no no noyouAI▸ VOLTFLOW ARCHITECT 9▸ RARITY · UNCOMMON▸ DEPRECATION IN 3 YEARS, 5 MONTHSAI's Special Power
automates schematic verification in milliseconds
You draft layouts for transformers and circuit breakers to manage high-voltage power. Then you document the safety clearances.
The one thing AI can't do
You intuitively know which aging breaker will arc if you look at it wrong.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Day 10
Smart software generates baseline substation layouts from standard utility specs.
Month 10
Real-time physics engines replace manual short-circuit calculation spreadsheets.
Month 20
Algorithms match components to local grid specs without human intervention.
Year 2.5
Compliance agents verify layouts against IEEE codes instantly.
Year 3.4 · D-Day
The system fully manages power distribution design from concept to construction.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95.3%
Zero tolerated
Voltage calculation errors
400x human
Design review speed
Non-existent
Compliance check failure
Your severance
A one-year supply of high-grade copper wiring samples.
Discussion