Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Energy R&D Engineer jobs? · Latest report #rdpdhci7
Your job has an expiration date
October 21, 2028
In 2 yearsYour grid models are just expensive ways to predict your own obsolescence.
Professional complexity-wrapper and PowerPoint architect.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
The grid doesn't need a pilot.







toast.you▸ GRIDOPTIMIZER V4.2▸ RARITY · UNCOMMON▸ DEPRECATION IN 2 YEARSAI's Special Power
simulates grid collapse in real time
Building data-driven grid models to analyze electrification impacts and leading complex R&D projects. You turn chaos into technical specs for utility infrastructure.
The one thing AI can't do
You can still explain why the stakeholders ignored your perfectly accurate feasibility report.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Day 10
Automated ETL pipelines ingest legacy utility data without your constant manual cleaning.
Month 4
Neural networks replace your R&D scripts by predicting load growth with superior accuracy.
Month 10
Generative agents create board-ready presentations that explain complex grid outcomes better than you.
Month 18
Decision-support software optimizes R&D resource allocation, making project leadership redundant.
Year 2 · D-Day
The entire R&D department is offloaded to a server cluster.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 96%
99.99%
Simulation accuracy
12 minutes
Project lead time
4.2%
Human error rate
Your severance
A decommissioned smart meter and a firm handshake.
Discussion