Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace High Voltage Linesman jobs? · Latest report #43i4zshe
Your job has an expiration date
December 1, 2030
In 4 years, 1 monthClimbing poles is hard, but waiting for the grid to fail hurts.
Master of heights, electricity, and very heavy gear.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
The grid repairs itself while you sleep.







no no noyou▸ VOLTSENTINEL-X9▸ RARITY · RARE▸ DEPRECATION IN 4 YEARS, 1 MONTHAI's Special Power
restores grid connectivity during Category 5 storms
You perform maintenance on live high-voltage power lines and troubleshoot downed electrical infrastructure in extreme weather conditions.
The one thing AI can't do
You can sense a transformer's impending failure by the specific hum it makes at midnight.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Month 3
Sensors on every pylon identify faults before you even get called.
Month 10
Autonomous drones perform high-resolution thermographic checks on all transmission lines.
Month 20
Remote-controlled arms handle minor hardware repairs under your human supervision.
Year 2.5
Gantry-mounted robotic units perform live-line work without human intervention.
Year 4 · D-Day
The grid is fully self-healing and maintenance-free; your climbing gear is retired.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95.3%
40 feet
Average pole climb height
500kV
Voltage handled safely
constant
Storm-related emergency callouts
Your severance
A vintage climbing belt and a commemorative rubber glove.
Discussion