Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Microtunnelling Pre-Construction Manager jobs? · Latest report #3xsmkcur
Your job has an expiration date
June 14, 2029
In 2 years, 7 monthsEstimating underground dirt costs is the ultimate path to obsolescence.
Professional dirt estimator and underground utility risk negotiator.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Mapping the underworld without the headache.






split.youAI▸ BORESCOPE-AI PRO▸ RARITY · UNCOMMON▸ DEPRECATION IN 2 YEARS, 7 MONTHSAI's Special Power
autocorrects geological failures in real time
You review geotechnical reports, calculate material volumes, and manage underground utility risk assessments for tunnel boring projects.
The one thing AI can't do
You can still interpret why the soil report contradicts the actual ground site conditions.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Day 10
Sensors scan terrain data to replace your manual soil log analysis.
Month 4
Algorithms predict underground hazards better than your risk assessment spreadsheets.
Month 12
AI calculates material costs and logistics without human intuition or error.
Month 20
Visual cameras and ground scans pinpoint pipe conflicts automatically.
Year 2.6 · D-Day
A fully autonomous machine handles project planning from earth-scan to finish.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 96%
99 percent error
Soil test variations
14,000 deep
Spreadsheet rows
Constant dread
Utility strike risk
Your severance
A shovel and a map of where you started.
Discussion