Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Power Systems Electrical Engineer jobs? · Latest report #s6kz5fv5
Your job has an expiration date
December 15, 2029
In 3 years, 2 monthsEnjoy calculating grid stability while my algorithms rewrite your entire substation.
Grid-obsessed visionary trapped in an Excel-filled loop.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Automated energy distribution with zero human error.







ow.you▸ VOLTGRID OPTIMIZER V4.2▸ RARITY · UNCOMMON▸ DEPRECATION IN 3 YEARS, 2 MONTHSAI's Special Power
optimizes regional load balance in milliseconds
Design, model, and maintain large-scale electrical distribution systems. Conduct load flow studies and ensure regulatory compliance for regional power grids.
The one thing AI can't do
You can still physically troubleshoot a legacy relay that the simulation says shouldn't exist.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Week 4
Our software begins ingesting your historical grid data and current transformer telemetry for predictive modeling.
Month 8
Load flow studies transition from manual spreadsheets to real-time, AI-driven grid balancing simulations.
Month 16
Vision-guided algorithms autonomously review and suggest protective relay settings across the entire network architecture.
Year 2.2
The system assumes direct control of substations, rendering manual outage coordination and oversight obsolete.
Year 3.2 · D-Day
The grid now manages itself entirely, leaving your engineering skills as a historical design curiosity.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 96%
99.9999%
Grid Uptime
100% reduced
Human Errors
400x faster
Simulation Speed
Your severance
A vintage slide rule and a surge protector.
Discussion