Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Roller Coaster Engineer jobs? · Latest report #6d6xgdud
Your job has an expiration date
December 6, 2029
In 3 years, 1 monthGravity does the hard work; now algorithms do the rest.
Turning Newtonian physics into expensive stomach-churning metal.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Perfect curves, zero human error, pure thrills.








ow.you▸ COASTERPATH V4▸ RARITY · UNCOMMON▸ DEPRECATION IN 3 YEARS, 1 MONTHAI's Special Power
calculates optimal heart-rate spikes per turn
Design track layouts and calculate force loads for steel roller coaster structures. Oversee safety inspections and stress tests.
The one thing AI can't do
You can still physically crawl the structure to spot a weld failure.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Day 10
Software generates track layouts using pre-set safety and thrill parameters.
Month 7
Simulation models identify structural weaknesses before a single beam arrives.
Month 18
Drones inspect weld quality and bolt torque during steel installation.
Year 2.2
Connected sensors transmit real-time telemetry data to verify safety compliance.
Year 3.1 · D-Day
The system assumes final sign-off authority and releases the ride.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95.3%
99.9% accurate
G-force simulation precision
48 hours
Track layout time
3 per project
Human calculation errors
Your severance
A lifetime pass to the park you helped design.
Discussion