Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Roller Shutter Engineer jobs? · Latest report #94h8exfu
Your job has an expiration date
December 16, 2029
In 3 years, 2 monthsYou spend half your life untangling jammed slats in the rain.
Master of the begrudging motor service call.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
The end of manual blind alignment.









brr.you▸ SHUTTERSYNC UNIT 9▸ RARITY · UNCOMMON▸ DEPRECATION IN 3 YEARS, 2 MONTHSAI's Special Power
realigns tracks with ultrasonic precision
You install, troubleshoot, and repair heavy-duty security shutters and electrical motors. You crawl through grease to fix drive chains.
The one thing AI can't do
You can sense exactly which rusted pin is causing the shutter to howl at midnight.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Day 10
Sensors report motor load and alignment before the shutter jams.
Month 8
Robotic brushes keep the guides free of debris and dirt.
Month 16
Parts become quick-click swappable, removing the need for manual tools.
Year 2.2
Small drones scan track integrity during off-peak night hours.
Year 3.2 · D-Day
The shutter self-corrects its own tension and alignment forever.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95.9%
94 percent
Call-out time saved
120 units
Slats unjammed per hour
zero
Grease stains remaining
Your severance
One free tub of heavy-duty hand cleaner.
Discussion