Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Scada Integration Engineer jobs? · Latest report #pvq8pkgi
Your job has an expiration date
July 23, 2028
In 1 year, 9 monthsYour complex network mapping is just a config file waiting for export.
Senior signal mapper, breaker-tripper and field-troubleshooter
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Connecting assets without human intervention






toast.youAI▸ GRIDSYNC AI V7.2▸ RARITY · UNCOMMON▸ DEPRECATION IN 1 YEAR, 9 MONTHSAI's Special Power
automates field point mapping at light speed
You map field devices to servers for power plant monitoring. Automation will soon bridge those communication gaps directly.
The one thing AI can't do
You can physically troubleshoot why the remote RTU port is failing in the rain.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Week 4
Sensors identify all field device registers without manual mapping.
Month 5
AI writes the PLC code based on project power requirements.
Month 10
Software simulations replace the need for physical on-site testing.
Month 15
Automated agents reroute communication paths when a signal drops.
Month 21 · D-Day
The system monitors the grid autonomously with zero human oversight.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95.3%
0 percent
Protocol translation errors
2 milliseconds
Average latency
Zero
Manual tag mapping time
Your severance
One free firmware update for your smart home
Discussion