Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Solar Engineer jobs? · Latest report #3g53v9g7
Your job has an expiration date
October 27, 2029
In 3 yearsYour spreadsheets and CAD files were always just future scrap paper.
Senior Project Engineer (Voltage enthusiast, CAD expert, grid dreamer)
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Perfect energy routing, zero human input.









brr.you▸ GRIDOPTIMIZER AI V4▸ RARITY · UNCOMMON▸ DEPRECATION IN 3 YEARSAI's Special Power
automates grid interconnection and site capacity planning
You design utility-scale solar arrays and battery storage sites. You manage grid interconnection, equipment procurement, and site layout.
The one thing AI can't do
You alone know why that one specific circuit breaker trip makes the site rattle.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Week 4
Algorithms map solar layouts based on topography data instantly.
Month 6
Yield analysis moves from PVSyst to integrated real-time cloud clusters.
Month 16
Bidding for panels and batteries happens via autonomous supply chains.
Year 2.1
AI-led filings reduce utility connection response times by months.
Year 3 · D-Day
The site deploys itself without your oversight or review.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 95%
20000 per hour
Grid model iterations
0.0001 percent
Procurement margin error
too high
Human decision latency
Your severance
One free solar panel for your garage roof.
Discussion