Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Solar Interconnection Processor jobs? · Latest report #qvd9dgbi
Your job has an expiration date
August 30, 2027
In 10 monthsYour manual grid-sync forms are just slow, glorified paper airplanes.
Professional email-chaser and spreadsheet-wrangler of renewable energy.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Approving permits faster than the utility can ignore.



squeeze.youAI▸ GRIDLINK AUTO-SYNC V4▸ RARITY · COMMON▸ DEPRECATION IN 10 MONTHSAI's Special Power
bypasses local grid operator bottlenecks instantly
You chase utility signatures and verify electrical diagrams to connect solar arrays to the power grid.
The one thing AI can't do
You can sense when a utility engineer is stalling because they hate your site design.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Week 4
Bots automatically pull status updates from slow utility websites.
Month 3
Vision models instantly verify your electrical diagrams against grid rules.
Month 6
Digital agent negotiations handle the back-and-forth for permit approvals.
Month 8
Machine-to-machine protocols bypass your need for human grid coordination.
Month 10 · D-Day
Your inbox is turned off and the grid connects automatically.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 97.1%
42 percent
Form rejection rate
112 per project
Average email threads
8 months
Waiting for signature
Your severance
A lifetime subscription to our automated email rejection tool.
Discussion