Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Substation Commissioning Engineer jobs? · Latest report #2nt7tbiv
Your job has an expiration date
October 22, 2030
In 4 yearsYour high-voltage testing routine is just a download waiting to happen.
Senior breaker-tripper and professional voltage-drop hunter.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Commissioning without the human contact risk.






blub.you▸ GRIDSYNC AUTOMATON V7▸ RARITY · RARE▸ DEPRECATION IN 4 YEARSAI's Special Power
calibrates protection relays in parallel
You perform secondary injection testing, check protection relay logic, and ensure grid synchronization before powering on new substations.
The one thing AI can't do
You can still physically distinguish a faulty wiring crimp by the subtle scent of ozone.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Day 13
Sensors map every connection in your substation for the model.
Month 4
Software takes over primary relay injection routines from your laptop.
Month 17
Gantry arms perform continuity checks without needing your manual oversight.
Year 2.7
The AI patches IEC 61850 bugs before you even spot them.
Year 4 · D-Day
The substation commissions itself while you look for another job.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 92%
0.04 seconds
Seconds per relay test
Infinite
Voltage surge tolerance
100 percent
Human error probability
Your severance
A decommissioned high-voltage fuse and a firm goodbye.
Discussion