Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Substation Design Engineer jobs? · Latest report #2i8hdyc4
Your job has an expiration date
December 16, 2029
In 3 years, 2 monthsYour complex CAD schematics are just data for our model now.
Master of single-line diagrams and grounding grid paranoia.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Automated grid topology for a stable future.








brr.you▸ VOLTARCHITECT PRIME▸ RARITY · UNCOMMON▸ DEPRECATION IN 3 YEARS, 2 MONTHSAI's Special Power
generates optimal busbar routing in seconds
You draft site layouts and single-line diagrams for electrical distribution. We turn these into optimized, fault-tolerant digital blueprints.
The one thing AI can't do
You can still physically walk the site to spot the one fence grounding error.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Week 4
Standardized components move from your brain into our training database.
Month 8
Software now generates the initial single-line diagrams based on load specs.
Month 16
A validation bot checks your designs against every local safety code.
Year 2.3
The AI determines optimal breaker placement without your manual intervention.
Year 3.2 · D-Day
Utility companies bypass engineering firms to purchase designs directly from us.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 96.4%
too many
average errors per layout
eight
design time weeks
non-zero
grid failure risk
Your severance
A decommissioned transformer for your front lawn.
Discussion