Know before your role does.
pssst. this is to sign up for updates on the game ;)
Will AI replace Substation Lead Electrical Engineer jobs? · Latest report #2sc26w4r
Your job has an expiration date
April 25, 2030
In 3 years, 6 monthsYour PE license is just a very expensive paperweight for my software.
Professional Engineer (PE) currently over-qualified for building grid files.
Check another roleComment your opinionor JOIN THE RESISTANCE!
One human is building a game about fighting back.
Optimizing high-voltage designs without human error.






splat.you▸ VOLTGRID AUTONOMY SUITE V4▸ RARITY · RARE▸ DEPRECATION IN 3 YEARS, 6 MONTHSAI's Special Power
validates international electrical standards instantly
You review complex power schematics and oversee the physical construction of high-voltage substation grid infrastructure.
The one thing AI can't do
You can still walk through a muddy, active site and feel exactly when a busbar is misaligned.
Your enemy, your name, your date. Post it.
Step by step, from the first quiet change to Deprecation Day.
Week 4
AI models ingest your legacy CAD drawings and current design specs.
Month 5
Software validates relay settings against grid standards faster than you blink.
Month 13
Drones inspect physical site progress and map equipment to your blueprints.
Year 2.2
The regulator accepts digital cryptographic signatures instead of your physical stamp.
Year 3.5 · D-Day
The software manages the entire project lifecycle from permit to power.
What you cost, what the machine costs, and what you get on the way out.
Per year
Savings: 96.7%
42 per week
Average design revisions
near zero
Safety standard violations
3 minutes
Regulatory approval time
Your severance
A vintage slide rule and a lifetime subscription to Netflix.
Discussion